武汉开锐海洋起重技术有限公司

按时大萨达阿萨德按时打算按时啊 按时啊是啊啊啊

Cost Reduction and Efficiency Enhancement Reach a New Level

Our Independently Developed New-Generation Intelligent Railway Wagon Leveling Machine Commences Operation at Fangchenggang Port


Release time:

2026-01-21

On January 16, 2026, the intelligent railway wagon leveling machine, designed and installed by our company for the No. 4 Loading Tower at the Bulk Yard of Fangchenggang Terminal, Beibu Gulf Port, completed handover and officially commenced production operations, injecting new efficiency into port production activities.

To accommodate the various types of railway wagons involved in bulk material transport at the port, the leveling head of this equipment features, for the first time, a dual-mode adaptive design for both open-top containers and gondola cars, allowing seamless switching of operation modes according to different wagon types. After commissioning, the equipment not only ensures material stacking flatness but also significantly improves loading efficiency in the bulk yard, further optimizes operational workflows, and effectively reduces labor costs and safety risks.